Contact Us

Sales Department Phone:

+86-18563147268

After-sales service:

+86-18563147268

Email:

fyf@weibafyf.com

Address:

Jiuhua Road, Huancui District, Weihai City, Shandong Province

Timing for Implementing Nondestructive Testing of High-Pressure Reactors

Specific timing for performing non-destructive testing on the welded joints of high-pressure reactor assemblies: 1. The weld joints of the high-pressure reactor shall undergo shape, dimension, and visual inspections first; only after passing these inspections can non-destructive testing be carried out. 2. Splice closures shall be subjected to non-destructive testing immediately after forming. If non-destructive testing has already been performed before forming, an additional non-destructive test must be conducted after forming, specifically in the transition zone from the arc section to the straight edge. 3. Materials with a tendency toward delayed cracking shall undergo non-destructive testing at least 24 hours after welding is completed. Materials with a tendency toward reheat cracking shall undergo an additional non-destructive test following heat treatment. 4. At standard tensile strength...




Implementation, inspection, non-destructive, conduct, welding, high pressure, joint, shall, standard, reactor